All forms Stone Work/Underlay

Orchard Crossing North and South

485 lf pedestrian bridge installation using 7 piers and helical screw piles. The bridge spans Blackberry Creek in Montgomery, Illinois.

Waterfall Glen

Project 1: Installed concrete abutments and a 40’x6’ pedestrian footbridge. Project 2: Removed damage stone and replaced with flagstone. The area creates a horseshoe effect around the waterfall.

Spring Creek Reservoir

Excavated and installed a 50 space parking lot and roadway with curb/gutter installation. Constructed a disposal containment facility and created a new paved pathway and overlay for the mile long path around the reservoir. Wetland plantings were installed for shoreline stabilization and habitat.

West Branch Preserve

Installed 550 tons of flagstone shoreline retaining wall and a limestone trail. Installed shoreline plantings to foster stabilization and create water habitat.

Mississippi Palisades State Park

Installation of boat ramps and an asphalt parking lot in a flood plain. ADA Renovations included an accessible floating dock.

Maple Lake Shoreline Stabilization

700 tons of outcropping flagstone was used to create a lineal wall of fishing pier and pathway for recreation. Excavated and built a flagstone wall for fishing. A fishing pier was built 80ft into the lake using helical screw piles as the base for foundation piers. Planted wetland plugs and coconut fiber rolls for shoreline stabilization and to create a natural habitat.