Bridge Installations

Orchard Crossing North and South

485 lf pedestrian bridge installation using 7 piers and helical screw piles. The bridge spans Blackberry Creek in Montgomery, Illinois.

Mallard Lake

Constructed a 2 mile, 10’ wide limestone trail. Drove pilings and built concrete piers for three pedestrian bridges interconnecting an island and mainland. Bridge installation included 4 spans 50’x8’; 3 spans 60’x8’; 1span 50’x10’. A floating barge was used to access the pilings and move the crane to various locations.

Linne Woods Forest Preserve

70’x8’ pedestrian bridge with concrete abutments.  Planted wetland plantings to create shoreline stabilization and a limestone trail.