500 tons of outcropping flagstone for shoreline stabilization to allow canoe and emergency vehicle access to the Des Plaines River. A limestone trail and parking lot striping was completed.
Excavated and installed a 50 space parking lot and roadway with curb/gutter installation. Constructed a disposal containment facility and created a new paved pathway and overlay for the mile long path around the reservoir. Wetland plantings were installed for shoreline stabilization and habitat.
Installed 550 tons of flagstone shoreline retaining wall and a limestone trail. Installed shoreline plantings to foster stabilization and create water habitat.
700 tons of outcropping flagstone was used to create a lineal wall of fishing pier and pathway for recreation. Excavated and built a flagstone wall for fishing. A fishing pier was built 80ft into the lake using helical screw piles as the base for foundation piers. Planted wetland plugs and coconut fiber rolls for shoreline stabilization and to create a natural habitat.