All forms of Concrete Work

IDOT Route 30

Bridge Deck Hydroscarificatino, Latex Overlay, Preformed Joint Seals, Structural Concrete, 3 mobilizations. This project was completed October 2009.

Orchard Crossing North and South

485 lf pedestrian bridge installation using 7 piers and helical screw piles. The bridge spans Blackberry Creek in Montgomery, Illinois.

Canoe Access – Irving Park Road and Dam 2

500 tons of outcropping flagstone for shoreline stabilization to allow canoe and emergency vehicle access to the Des Plaines River. A limestone trail and parking lot striping was completed.

Spring Creek Reservoir

Excavated and installed a 50 space parking lot and roadway with curb/gutter installation. Constructed a disposal containment facility and created a new paved pathway and overlay for the mile long path around the reservoir. Wetland plantings were installed for shoreline stabilization and habitat.

West Branch Preserve

Installed 550 tons of flagstone shoreline retaining wall and a limestone trail. Installed shoreline plantings to foster stabilization and create water habitat.

Bunker Hill Shelters and Various Shelter Program

Removed and replaced sixteen (16) 40'x50' picnic shelters. Five subcontractors were employed for the project.

Maple Lake Shoreline Stabilization

700 tons of outcropping flagstone was used to create a lineal wall of fishing pier and pathway for recreation. Excavated and built a flagstone wall for fishing. A fishing pier was built 80ft into the lake using helical screw piles as the base for foundation piers. Planted wetland plugs and coconut fiber rolls for shoreline stabilization and to create a natural habitat.