Projects

  • Forest Preserve District Cook County

    Removed and replaced sixteen (16) 40'x50' picnic shelters. Five subcontractors were employed for the project.

  • Forest Preserve District Cook County

    500 tons of outcropping flagstone for shoreline stabilization to allow canoe and emergency vehicle access to the Des Plaines River. A limestone trail and parking lot striping was completed.

  • Forest Preserve District Cook County

    70’x8’ pedestrian bridge with concrete abutments.  Planted wetland plantings to create shoreline stabilization and a limestone trail.

  • Forest Preserve District DuPage County

    Constructed a 2 mile, 10’ wide limestone trail. Drove pilings and built concrete piers for three pedestrian bridges interconnecting an island and mainland. Bridge installation included 4 spans 50’x8’; 3 spans 60’x8’; 1span 50’x10’. A floating barge was used to access the pilings and move the crane to various locations.

  • Forest Preserve District Cook County

    700 tons of outcropping flagstone was used to create a lineal wall of fishing pier and pathway for recreation. Excavated and built a flagstone wall for fishing. A fishing pier was built 80ft into the lake using helical screw piles as the base for foundation piers. Planted wetland plugs and coconut fiber rolls for shoreline stabilization and to create a natural habitat.

  • Illinois Department of Natural Resources/Illinois Capital Development Board

    Installation of boat ramps and an asphalt parking lot in a flood plain. ADA Renovations included an accessible floating dock.

  • Inland Realty LLC

    485 lf pedestrian bridge installation using 7 piers and helical screw piles. The bridge spans Blackberry Creek in Montgomery, Illinois.

  • Forest Preserve District DuPage County

    Excavated and installed a 50 space parking lot and roadway with curb/gutter installation. Constructed a disposal containment facility and created a new paved pathway and overlay for the mile long path around the reservoir. Wetland plantings were installed for shoreline stabilization and habitat.

  • Naperville Park District

    Shoreline stabilization included pile driving a steel retaining wall and landscaping.

  • Forest Preserve District DuPage County

    Project 1: Installed concrete abutments and a 40’x6’ pedestrian footbridge. Project 2: Removed damage stone and replaced with flagstone. The area creates a horseshoe effect around the waterfall.

  • Forest Preserve District DuPage County

    Installed 550 tons of flagstone shoreline retaining wall and a limestone trail. Installed shoreline plantings to foster stabilization and create water habitat.